No idea why this is happening, the Data Action returns a 400 Bad Request when trying to sync shift swap approvals back to the WFM module.
- Agent initiates swap via self-service portal
- Architect flow triggers the custom Data Action endpoint
- Response payload includes
approval_status and agent_id but the WFM API rejects the update
Running Architect v2.1 with standard WFM integrations in the Chicago timezone. Need to know if the payload schema requires a specific schedule_version field.
you need to check the content-type header in your data action configuration. it defaults to application/json but some older wfm endpoints expect application/x-www-form-urlencoded or specific xml structures depending on the api version. also ensure the agent_id matches the internal uuid format, not the email or extension. the 400 error usually means the schema validation failed on the payload structure itself. try logging the raw response body from the wfm endpoint to see the exact field causing the rejection. often it is a missing required field like shift_id or a timestamp format issue. use the developer tools in architect to inspect the outgoing payload before it hits the http request node. if you are using a custom rest api, verify the authentication token is still valid and has the correct scope for schedule modifications. cross-reference the wfm api docs for the exact endpoint requirements.
As far as I remember, the wfm api expects the shift swap payload to include the schedule_group_id alongside the agent id. without it, the endpoint cannot resolve the context for the availability update. check your json structure against the wfm api docs for the specific required fields.
The documentation actually says schedule_group_id is mandatory for context resolution, which aligns with the suggestion above. Verify your payload includes it.
{
"agent_id": "uuid-here",
"schedule_group_id": "sg-uuid-here",
"approval_status": "approved"
}